    1. Branded Cover

    Company name, logo and contact details on the first page. It sounds trivial; it is the difference between looking like a company and looking like a contact number in WhatsApp.

    2. System Design

    Panels, inverter, capacity, and what gets mounted where. Say what is being installed and why it fits the roof and load — not just a total wattage.

    3. Generation Estimate

    Be conservative. Rooftop generation in India commonly plans around 4 to 4.5 units per kW per day, and quoting the optimistic end of that range is how "performance complaints" start. Show the yearly estimate, not only the daily one.

    4. Cost Breakdown with GST Per Line

    Customers compare your number with other numbers. If your GST is bundled into a single blended figure, it invites suspicion. Show each line — panels, structure, inverter, installation — with its own GST rate, since solar PV goods and structures or services typically attract different rates.

    5. Subsidy (Residential Only)

    For domestic customers, PM Surya Ghar support changes the effective cost meaningfully — up to ₹30,000 per kW for the first 2 kW and a fixed ₹78,000 at 3 kW and above. For commercial jobs, leave it out entirely; including it signals you do not know the rules.

    6. Financing Options

    Most customers will ask about EMIs whether or not you bring it up. Show 3, 5 and 7 year tenures so the monthly number is visible next to the one-time number.

    7. Payment Terms

    Clear milestones — typically an advance and a balance tied to stages of work — with dates. Ambiguous payment schedules cause the worst kind of customer relationship.

    8. Warranties

    Panel, inverter and workmanship warranties, each with who honours it.

    9. Signature and Contact

    Who the customer is dealing with, and where to sign.

    One Document, Several Audiences

    The customer wants a total; your vendor wants line items; procurement wants a proforma. Serious proposal tools — see Doctor Solar Wala's proposal module — generate these formats from the same data so the numbers never disagree between documents. The quotation module produces the priced first draft that proposals build on.

    Frequently Asked Questions

    What sections should a solar proposal include?

    A complete solar proposal carries: a branded cover, the proposed system design, a generation estimate, cost breakdown with GST per line item, subsidy (for residential customers), financing or EMI options, payment terms, warranties, and the company's contact and signature details.

    How should GST be shown in a solar proposal?

    Per line item, not as one blended percentage. Solar PV goods and mounting structures or installation services can attract different GST rates depending on their HSN classification, so each line should carry its own rate and the invoice should follow the same split.

    Should a solar proposal mention subsidy?

    Yes for residential customers — PM Surya Ghar subsidy applies to domestic installations and changes the effective out-of-pocket cost significantly. For commercial and industrial proposals, subsidy should not appear, since the scheme does not apply.